Data Centre Phase 3 DUB06

Project Name

Data Centre Phase 3 DUB06

Client:

Blue Chip Company

Sector:

Private

Location:

West Dublin

Main Contractor:

John Sisk & Sons

Contract Period:

Feb 2014- Aug 2015

• New Data Facility 21,000m2 building.
• Reduce level strip and disposal 55,000m3 Greenfield Inert to licensed Tip. Rock breaking 6,000m3 for site prep.
• Site Prep & Bulk Filling Hardcore.
• Substructure pad foundations & bulk filling lean mix.Rock breaking 3000m3 for pads.
• Internal Grading Floors & Perimeter Ground Beams. Internal Drainage &Pop Ups/ Radon system.                                                                                                               • Storm/Foul Drainage deep. 500m deep 900 dia SW drainage associated rock breaking. Deep Petrol Interceptors.
• Temporary Works.
• Ducting LV/COMMS/MV Power supply.
• Watermain/Sprinkler Mains.
• Sprinkler Tanks & associated pump houses.
• Connections to local authority services.
• External Works – Footpaths, Roads, Kerbs, Paving, Paving, Generator Compounds, Yard Slabs.
• Landscaping – Construction Berms & Topsoil external areas.