Kevin Street New Garda Headquarters
Project Name
Kevin Street New Garda Headquarters
Client:
OPW
Sector:
Public
Location:
Kevin Street, Dublin
Main Contractor:
JJ Rhatigan
Contract Period:
March 15 - Sept 15
- Project New Garda Headquarters.
- Basement excavation & disposal 7.00m below street level, circa 18,000m3 material removed.
- Substructure works, blinding, under slab drainage, petrol interceptors, foul tanks, water tanks below slab.
- Piling attendance & disposal pile arisings.
- Breaking down piles and preparing heads for pile caps/slab.
- Site drainage and services works.
- Local connections; crossing busy live road/footpaths.