Charlemont Square
A mixed used development double storey basement dig 8.00m deep brownfield site. M&N excavated approx 130,000m3 material and disposed off site. Temporary works – M&N installed propping to perimeter basement. M&N achieved over 130 artic loads per day at height project. Substructure – Blinding works carried out. Sub slab drainage & In slab drainage works.