Data Centre

Dub 72

The project involved the construction of a 2 storey data storage facility. M&N Civils scope of work included: Stockpile removal circa 80,000m3. Reduce level dig circa 50,000m3 Excavation of substructures consisting of pad and strip foundations Substructures upto underside of grnd floor slab Foul & SW drainage 2,000m Watermain, Industrial water 42,000m of MV, LV, […]

Dub 72 Read More »

DUB 90

M&N scope of works: Site strip and removal off site of 20,000m3 spoil Excavation of structural pads and installation of concrete blinding Installation of all underground site infrastructure including service ducting and drainage – both foul and surface water M&N worked to a very time sensitive program on this project, as the duration from commencement

DUB 90 Read More »

DUB 68 / 78

The project involved the construction of two no. new Data Centres with a combined footprint of 50,000m2. M&N’s scope of works included: • Site strip and disposal of 50,000m3 inert material offsite • Excavation of substructures consisting of pad and strip foundations (18,000m3) • Deep line drainage reaching 8.00m depths consisting of 375mm-1200mm diameter pipelines

DUB 68 / 78 Read More »

Data Centre – DUB058

New Data Centre 24,000m2 building. Site strip and disposal of 70,000m3 greenfield inert to licensed tips. Substructures, Pad foundations & bulk filing leanmix. Deep line drainage 375-1200 dia pipes SW/FW ranging from 5m-8m deep. Rock breaking circa 15,000m3 for trenches. Temporary works. Connections to local park services. Providing New entrance onto existing park. Attenuation pond

Data Centre – DUB058 Read More »

Project Gemini

Extension to existing data centre. M&N done all enabling works including demolition/alterations of existing site structures & services. M&N removed circa 8,000 m3 material off site. M&N carried all substructure works to building. All Site infrastructure works by M&N. Working in live data centre environment. Landscaping & External works to new data centre extension.

Project Gemini Read More »

Data Centre Phase 4 DUB07/08

• 32,000m2 New Data Centres to existing Campus • Bulk Excavation & Disposal Off Site 50,000m3 Greenfield Inert. Rock Breaking 6000m3 • Site Prep bulk filling Hardcore & laying Terram. • Pad Foundations & Bulk Filling Lean mix and backfilling on completion. • Filling floor to grading levels and installing internal Drainage/Radon & Pop Ups.

Data Centre Phase 4 DUB07/08 Read More »

Data Centre Phase 3 DUB06

• New Data Facility 21,000m2 building. • Reduce level strip and disposal 55,000m3 Greenfield Inert to licensed Tip. Rock breaking 6,000m3 for site prep. • Site Prep & Bulk Filling Hardcore. • Substructure pad foundations & bulk filling lean mix.Rock breaking 3000m3 for pads. • Internal Grading Floors & Perimeter Ground Beams. Internal Drainage &Pop

Data Centre Phase 3 DUB06 Read More »

IBM Conversion Project

Project was to convert an existing manufacturing facility to office space, in a live secure campus environment. Working in live environment safety paramount. M&N installed new drainage, internal and external. Substructure works; pad foundations for new internal mezzanine floor, RC wheelchair escape ramps. External works, RC bunded plinths, foundations and RC support structures for new

IBM Conversion Project Read More »