Data Centre Phase 2 DB5

Project Name

Data Centre Phase 2 DB5

Client:

Blue Chip Company

Sector:

Private

Location:

West Dublin

Main Contractor:

John Sisk & Sons

Contract Period:

Feb 2013- Sept 2014

• New Data Facility 15000m2 building.
• Reduce level strip and disposal 30,000m3 Greenfield Inert to licensed Tip. Site Prep & Bulk Filling Hardcore.
• Substructure pad foundations & bulk filling lean mix. Rock breaking 2000m3 for pads.
• Internal Grading Floors & Perimeter Ground Beams.  Internal Drainage &Pop Ups/ Radon system.
• Storm/Foul Drainage deep. 500m deep 900 dia SW drainage associated rock breaking. Deep Petrol Interceptors.
• Attenuation Tank- 3nrx1500 dia pipes 150m.
• Temporary Works.
• Ducting LV/COMMS/MV Power supply.
• Watermain/Sprinkler Mains.
• Link bridge to existing data centre.
• Connections to local authority services.
• External Works – Footpaths, Roads, Kerbs, Paving, Paving, Generator Compounds, Yard Slabs.
• Landscaping – Construction Berms & Topsoil external areas.